Residence
»
RAILWAY NEWS
»
Reminder: No trains between London and Peterborough or Royston
Thursday, January 23, 2025
Community Rail has introduced main upgrades on the East Coast Major Line (ECML), impacting companies on January 25–26 and February 1–2, 2025.
Passengers are suggested to plan forward, examine journey planners, and permit further journey time as London King’s Cross station might be closed on each weekends for essential engineering work.
Deliberate Disruptions
Rail alternative buses will function, however there might be no Thameslink or Nice Northern trains operating between London and Peterborough, Royston, and Stevenage through Hertford North on Saturdays.
On Sundays, restricted companies will prolong barely south to Letchworth Backyard Metropolis.
Followers attending the Arsenal vs. Manchester Metropolis match on the Emirates Stadium on February 2 ought to observe that rail alternative buses won’t function past Alexandra Palace to Finsbury Park between 12:30 pm and eight:00 pm as a result of security considerations.
Different journey choices embrace Midland Major Line Thameslink companies to London St Pancras Worldwide and strolling to Euston for Victoria Line connections.
For real-time updates and journey planning, passengers are inspired to make use of the Nationwide Rail and Transport for London (TfL) web sites.
Key Upgrades
The deliberate works are a part of the East Coast Digital Programme (ECDP) and different infrastructure upgrades aimed toward bettering reliability, sustainability, and effectivity on the ECML.
Key tasks embrace:
Observe Renewal North of Stevenage: Enhancing efficiency and decreasing upkeep necessities.
Bridge Timber Investments South of Finsbury Park: Strengthening important buildings.
Change and Crossing Upgrades at Welwyn Backyard Metropolis: Modernizing elements that permit tracks to separate and rejoin.
Tunnel Drainage Enhancements at Hadley Wooden: Enhancing water administration for long-term sturdiness.
Overhead Line Tools Enhancements: Modernizing techniques at Biggleswade and Bounds Inexperienced.
Beneath-Observe Cabling for Digital Signalling: Putting in superior cables between Biggleswade and Peterborough for the £1.4 billion ECDP, supporting in-cab signalling for greener, extra dependable journeys.
Statements from Officers
Simon Pumphrey, Community Rail Infrastructure Director, highlighted the significance of those upgrades:“The work our groups will full over these weekends goes past routine upkeep.
By combining tasks, we maximize the monitor closures to attenuate future disruptions. We apologize for the inconvenience and thank passengers for his or her endurance.”
Jenny Saunders, Govia Thameslink Railway’s Buyer Service Director, emphasised efforts to mitigate disruption:“We’ve arranged replacement buses, shuttle trains, and ticket acceptance on alternative routes. Please check online planners and allow extra time for your journey.”
Journey Recommendation
Passengers touring north of London are urged to verify service modifications and discover different routes, together with alternative buses and shuttle trains.
For the most recent updates, go to the Community Rail and TfL web sites.
Tags: Arsenal match journey recommendation, Biggleswade digital signalling, East Coast Digital Programme, East Coast Major Line upgrades, Finsbury Park journey disruption, Nice Northern companies, Hadley Wooden drainage enhancements, london, London King’s Cross closure, Community Rail Engineering Works, Peterborough, rail closures February 2025, rail alternative buses, Royston, sustainable rail upgrades UK, Thameslink disruption, practice journey January 2025, Welwyn monitor upgrades